Common problem

Enterprise project-management tools are heavy, costly and slow to set up for an SME contractor

Powerful platforms demand BOQ and accounting setup before a small team gets any value at all.

Tools like Mango and BUILK are genuinely powerful, but they are built for large organisations. They ask a small contractor to configure a bill of quantities, an accounting structure, and cost codes before the first useful screen appears. SiteBoard fixes this by starting from the two things that move the needle first — planning and progress — with no BOQ or accounting setup, so a team of five running two houses is live in minutes instead of abandoning the tool and going back to Excel and LINE.

Start free

Signs you have this problem

  • You bought or trialled a big PM/ERP tool and never finished setting it up.
  • The software needs a BOQ or accounting configuration before it does anything useful.
  • The monthly cost feels heavy for the size of your team and your margins.
  • You need a consultant or a training project just to get started.
  • Most of the features are for a company far bigger than yours.
  • In the end the crew still runs the real job in Excel and LINE anyway.

Why it happens

Enterprise tools optimise for completeness, not for a fast start. They assume a dedicated admin, a finance team, and months to roll out — reasonable for a large firm, fatal for an SME contractor who needs value this week. The setup cost is front-loaded and huge, so a small team never reaches the point where the tool pays off.

How to fix it

Pick a tool sized for your team: it should deliver value on day one from planning and progress, not demand a full cost-accounting rollout first.

  1. Start with the two things that move the needle first — planning and progress — not BOQ and accounting.
  2. Choose software you can set up yourself, without a consultant or a training project.
  3. Make sure the first useful screen appears in minutes, not weeks.
  4. Match the price to an SME budget, ideally with a free tier to prove it out.
  5. Add heavier capabilities like cost control later, once the basics are earning their keep.

How SiteBoard fixes it

  • Light by designStart with planning, not a heavyweight ERP. No BOQ, cost codes, or accounting setup required to get value.
  • Live in 5 minutesCreate a project, lay out the plan, invite the crew. No onboarding project, no consultant.
  • Priced for SMEsFree for one project, then a flat monthly price — a fraction of the incumbents, sized for a small team’s margins.
  • Grows with youCost control, inspections, and documents come next — added when you are ready, never demanded up front.
Start free
In short

Enterprise tools feel too heavy for an SME contractor because they optimise for completeness, not a fast start: they assume a dedicated admin, a finance team, and months to roll out, so the setup cost is front-loaded and a small team never reaches the point where the tool pays off. The fix is to pick software sized for your team — one that delivers value on day one from planning and progress, that you can set up yourself without a consultant, and that matches an SME budget with a free tier to prove it out. Heavier capabilities like cost control belong later, once the basics are earning their keep. SiteBoard is built this way: no BOQ or accounting to start, live in about five minutes, free for one project, then a flat monthly price a fraction of the incumbents.

Frequently asked questions

How is SiteBoard different from Mango or BUILK?

Those are powerful, complete platforms built for larger firms, and they expect BOQ and accounting setup first. SiteBoard starts from planning and progress, so a small team gets value in minutes instead of weeks — you can add heavier capabilities later.

Do I need to set up a BOQ or accounting to start?

No. You create a project, lay out a Gantt, and start tracking progress. There is no bill of quantities or cost-accounting configuration standing between you and a working schedule.

Is it actually affordable for a small contractor?

Yes. It is free for one project, then a flat monthly price — a fraction of what the enterprise tools cost, and sized deliberately for SME margins.

Will I outgrow it?

The plan is to add cost control, inspections, and documents over time, so SiteBoard grows with you — but only when you choose, never as a barrier to getting started.